The SMETAN engineering Management Model

to control the flow means to control production

Management Systems


The foundations of the modern factory
values
systems

 

The pillars of the modern factory
organize flow
create flow
maintain flow


Production Line
Production Line:
S-Type
U-Type

The degree of communication and interaction determines the setup of the production line.



Production Cells
Production Cells
all operational steps are in one run


Balanced production:
the customer's pace controls the production cells
the pace of the most critical process determines the bottleneck
the buffer controls the bottleneck
Production Layout
The manufacturing layout allows the greatest possible autonomy within production.
  Kontakt    Masterhead    Privacy Policy    Terms & Conditions    Disclaimer    Downloads